2 9 out of 5 stars 4.
Mayline parallel bar installation instructions.
Instructions to convert above board parallel rule to under board attachment when ordering components specific color and or size information may be required.
Only 1 left in stock order soon.
Remember to read all the instructions before beginning the installation or you may miss the opportunity to install the metal clips which stop your bar for moving side side or worse you could damage the bar.
Even in today s world of electronics many design professionals are still using parallel straightedges to draw a line that is square drafting triangles or helping with quick sketches before reproducing your ideas electronically.
Parallel straightedge replacement parts can be found here.
Align cable parallel with edge of board as shown in fig.
Turn knob f onto stud.
Over time the screws become loose causing the wire to become slack.
The drafting bar literally floats across the drawing surface and come with all mounting hardware.
Ball bearing rollers built into durable black phenolic plastic base.
Get it as soon as wed sep 9.
Attach cable ends with terminals to spring.
Place each pulley between your thumb and index finger.
Mayline parallel straightedge options explained.
Ball bearing rollers available in metal recommended for vellum bond and delrin for drafting film.
The wire used to move the parallel bar up and down is mounted on a series of pulleys which are in turn mounted to the drafting board with screws.
The site navigation utilizes arrow enter escape and space bar key commands.
These products are also called mayline parallel straightedges parallel drafting bars parallel bars and parallel straightedges.
Left and right arrows move across top level links and expand close menus in sub levels.
This parallel bar moves seemlessly across the drawing surface has resulted in little to no smudging and in conjuction with a proper set.
Contact a mayline customer service representative.
Be sure cable passes between clamp and corner plate.
Drill 3 32 pilot holes at marked locations.
Parallel with worksurface edge.
Install cable clamp e onto stud of left corner plate c.
Examine the pulley mounts.
Transparent blade for see through registration and fine line drawing quality.
1 16 of 101 results for mayline parallel bar price and other details may vary based on size and color.
Up and down arrows will open main level menus and toggle through sub tier links.
Secure corner plates using four 6 x 1 2 screws d.
66 and 72 rectangular desk assembly instructions ard7230 ard6630 ard6030.
Overview straightedge mobile parallel ruling w e z grip.
Be sure that the cable passes between cable clamp and l h.
Alvin paral liner 1101 48 mobile parallel straightedge 48 inches.
Align cable parallel with edge of board stedge stop cable 1b cable 1a 9.